Feasibility Study, design, drawing, preparation of BOQ, Tender documents, financial modality and full time supervision. 1) Water Supply Services (GWTP-11 nos., SWTP-03 nos., PTW-37 nos., Pump house-55 nos., TTW-76 nos., Pipeline-607km, water meter-66056 nos., Water point-1845 nos., Overhead Tank-13 nos.) 2) Feasibility study on water supply system and sanitation management, faecal sludge treatment plant, solid waste management system, drainage facilities, pipe line network and others components Sanitation Facilities (Public Toilet-144, Community Latrine-457 nos.) 3) Fecal Sludge Treatment Plant -23 nos. 4) Solid Waste Management Facilities and solid waste shorting shed 23 nos. 5) Drainage system for 23 Pourashava-92.17 km 6) Rehabilitation of Existing Facilities; 7) Capacity Building & Awareness; 8) Implementation Support (Full Time supervision). 9) Environmental Mitigation Plan 10)Social Impact Assessment (SIA) & Environmental impact Assessment (EIA); Overall objective:
|