Project Name: Feasibility and Project Preparation Study for Development of Water Supply and Baseline Survey, Feasibility Study, Preparation of Master Plan and Investment Project including top supervision and Environmental Sanitary Facilities for Chittagong Hill Tracts Districts. (7 Pourashavas, 78 Union)
Description of Actual Services provided by our staff:
- Preparation of feasibility study and master plan on water supply, sanitation system, environmental sanitary facilities etc.
- Prepared pipe network of Pourashavas (7 Nos.) &Union (78 Nos.) based on GIS map.
- Design & drawing of primary, secondary & tertiary drain line, culvert and other works for drainage system of Cities.
- Description of the Project:
- Surveys and designs for water supply system, Treatment Plants, Intake facilities, Sludge Tank, overhead water tank and environmental sanitation rehabilitation, improvement and extension programmer, institutional development, training in management, maintenance and operation. Initial two years rehabilitation programmer by 3 years programmer of new works. Aim to establish a self-sufficient and viable water supply and sanitation structure within 7 Paurashavas in Chittagong Hill Tracts Districts.
Main deliverables / Outputs:
- Development of Feasibility Studies and Preparation of Master Plan for rural areas
- Development of Feasibility Studies and Preparation of Project Proposal for Pourashavas
- Project Management and Monitoring culvert and other works for drainage system of Cities.