Description of Actual Services provided by our staff:
- Preparation of outline Design and planning for ICB 2.9 and 2.10.
- Taking over from DWASA/DMC (Design Management Consultants) of the existing database, drawings, computerized GIS Model, including projections based on the model for the future expansion.
- Review and verification and quality assurance of the model & take the full responsibility for using the model in network analysis with necessary modification.
- Carryout extensive survey of existing water system in ICB 2.9 (Zone 2) and ICB 2.10 (Zone 1) area and inspection of the interior condition of the pipe network by appropriate devices
- Production of a record that identifies the location and technical appropriateness of the individual service connections. Supervision and control of service connection at zonal level with appropriate materials.
- IEE (Initial Environmental Examination), EMP (Environmental Management Plan) and RP.
- To update IEE (Initial Environmental Examination), EMP (Environmental Management Plan) and RP. (Resettlement Plan) for ICB 2.7 and prepare IEEs with EMPs and RPs for ICB 2.7, and prepare IEEs with EMPs and RPs for ICB 2.9 and 2.10, and submit all to ADB for review prior to finalization to establish a system to implement EMP to ensure compliance with ADB environmental guidelines and rules of the government of Bangladesh.
- Social Strategy and gender issue
- To review existing gender action plan (GAP) of Dhaka Environmentally Sustainable water Supply Project (DESWSP) in respect of the following:
- Objective of the gender action plan.
- Water and associated gender issues
- Women's participation in operation and maintenance of water supply.
- Women's involvements in construction related works.